New Document Available – Full Preliminary Report from RBF on Buildout Reduction

This just in:

More than just the one chapter presented by the CCSD’s blue ribbon committee on Build-out Reduction, the latest document available here at aboutcambria.com is the 62 page more comprehensive report and analysis provided by RBF Consulting to the CCSD in August 2005.

Download it from the library . Find it fast using the dropdown menu or browse the available documents.

And COMING VERY SOON:

(possibly as you read this post)

CCSD Budget Expenditure Reports for most of 2007. These detailed records show where every penny is spent. And they will be available in AboutCambria.com’s Library, along with other public records, as they become available. Transparency is only useful if we take advantage of the access to become better informed.

More valuable than a gallon of gas? Say YES! with a small donation today.

Last 5 posts by Amanda Rice

This entry was posted in CCSD. Bookmark the permalink.

Leave a Reply

Your email address will not be published.

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

AboutCambria was established as a no-cost, convenient forum where Cambrians could meet, exchange information and discuss Cambria's future. When commenting please remember: Be courteous, stay on topic, be succinct, contribute new information, cite sources and above all "PLAY NICE".